Parts of loading ramp is not too much, because this installation not a machine but compiled from a number of profile steels. Part of loading ramp is consisted:

  • Bays, that is part of construction of floor place of heap palm fruit keeled over 27-30 degrees that palm fruit can go down easily
  • Door of loading ramp, that is peripatetic equipment fluctuateed to arrange number of palm fruits coming into lori/fruit scrapper conveyor.

100_2148

  • Hydraulic of Pack, equipment to move door of loading ramp. Actually activator loading ramp there are two types, besides hydraulic of pack door of can be moved by elektromotor ( system quadran) by using crank help and equiped with burden ballast. This construction has started leaved to remembers every door is equiped [by] 1 unit elektromotor and 1 ballast burden unit. This very extravagant construction but has damage excellence localization. For example damage of 1 unit elektromotor menganggu 1 door unit only only, while at hydraulic system of damage at 1 unit elektromotor will bother some doors served by hydraulic of pack.
  • Slide plate and fruit retainer, that is plate mild steel 5 mm to point fruit of gliding and lessens number of palm fruits falling to mill floor.
  • Rail for empty lorry which will be filled and fruit scrapper conveyor.

DSC01284

  • Borders for operator stands up.
  • Some palm oil mills complements conveyor garbage to facilitate dismissal of garbage under loading ramp.

Operational supporter equipments in loading ramp that is; transfer of carriage, bollard, capstan and rail track.

Komentar

Postingan populer dari blog ini

Under Flow Sludge flow out

  Gambar CST   Cairan yang masuk ke CST akan membentuk lapisan sesuai fisiknya. Minyak pasti berada pada level teratas, dominan air dilapisan ke dua dan dominan lumpur / sludge dilapisan paling bawah. Sludge ini masih mengandung minyak sawit 5-7 % bahkan jika CST tidak bekerja maksimal kandungan minyak sawit di sludge bisa mencapai > 12 %. Sludge ini secara kontiniu harus dialirkan keluar dari CST ke Sludge Tank untuk di ambil kembali kandungan minyak sawitnya serta menjaga kestabilan pembentukan lapisan minyak di CST.

Tahapan Proses Perebusan di Vertical Sterilizer

       Gambar kiri Vertical Sterilizer tampak keseluruhan dan sebelah kanan pintu bawah vertical sterilizer sedang mengeluarkan buah matang rebus.   Prinsip proses perebusan buah sawit di vertical sterilizer sama dengan proses perebusan di horizontal sterilizer. Adapun tahapan proses perebusan buah sawit di vertikal sterilizer sbb:

Temperatur Gas Buang Boiler

Temperatur gas buang boiler menjadi indikator kondisi effisiensi boiler yang kita operasikan. Semakin tinggi temperatur gas buang boiler pada kondisi kerja normal maka semakin tidak effisien boiler kita, demikian sebaliknya. Batas temperatur normal temperatur gas buang boiler berbeda bagi setiap merk boiler, oleh sebab itu pastikan spesifikasi boiler anda dengan mengacu kepada manual book yang ada. Untuk boiler tertentu, temperatur gas buang maksimal 350 derajat celcius. Angka ini dapat dibaca melalui alat ukur thermometer yang dipasang dibagian belakang, akhir pipa air, atau dipanel digital yang disediakan. Jadi untuk memastikan boiler anda masih effisien atau tidak pastikan alat ini terkalibrasi dengan baik. Jika temperatur boiler sudah tinggi, melebihi 350 derajat celcius, lakukan shot blowing untuk membersihkan abu yang masih lengket dipipa boiler pada saat pengorekan abu, jika temperatur tidak turun secara signifikan lakuken pencucian pipa air boiler pada saat pabrik tidak mengo...